✅ Suspended slabs poured for : Tower 1 – Levels 3&4; and Tower 2 – Levels 1&2. ✅ Next 2 levels in each tower will be finished in the next 2 weeks. ✅ Builders hoist lift is installed and operational. ✅ Removal of back-props is progressing well. ✅ Fit...